MOQPools
No recent pool joins yet

Factory Price 50W IP65 Waterproof Dustproof 200lm/W 3000K/4000K/5000K/6500K Outdoor LED Solar Street Garden Lighting for Riverside

2d 00h
Price tiers
Swipe →
US$257.00
1+ units

Key attributes

Customization
Available
Power Supply
Solar
Color Temperature
3000K-6500K
Model No.
MF-SP5-P50W
Lamp Body Material
Aluminum
Application
Square, Garden, Parking Lot
Ip Rating
IP65
Certification
CCC, CE, ETL, FCC, RoHS, SAA
With Light Source
Without Light Source
Battery
Li-ion
Lumen Efficiency
210lm/W
Charging Time
4.8-6.8h
Run Time
7.2h
Cri
70/80+
Warranty
3 Years
Transport Package
1PCS/Carton
Trademark
MF
Origin
China
Hs Code
9405429000
Production Capacity
10, 000PCS/Months
Model
MF-SP5-P30W
Control Function
Photocell sensor, Timing, dimming, intelligent power saving, microwave sensor or PIR sensor.
Work Mode
4H-Detected 100%, None 30% ;3H-Detected 70%, None 30% ;3H-Detected 50%, None 20%; 4H-Detected 30%, None 10%
Led Model
5050, custom on request
Efficacy
210lm/w
Luminous Flux
6300lm
Lens
Polycarbonate
Cct
3000K, 4000K, 5000K, 5700K, 6500K
Beam Angle
T203(65*150°) / T212(75*165°) / T304(75*160°) / T402(80*150°) / T502(150*150°)
Housing
Aluminum + SPCC
Mounting
Post Top
Painting
Black, custom color on request, C5-grade painting
Solar Panel
18V 50W
Battery Voltage
12.8V 18AH
Li-Ion Battery
230.4WH
Battery Lifespan
>2000 time cycle
Ambient & Storage
-10°C to 50°C (14°F to 122°F) / -20°C~45°C (-4°F to 113°F)
Maximum Autonomy
Operate 2~3 rainy days under intelligent model.
Product Size
815*365*55 mm
Carton Size
1042*435*140 mm
Net Weight
8.6kg/19lbs
Gross Weight
10.6kg/23.4lbs
Recommend Installation Height
4-7m
Application Field
Road & street, residential area, garden, parks, parking lot, industrial and commercial parks, railway & station side, riverside & jogging track
Storage Instruction
For long-term storage, it is advisable to first fully charge the battery, then discharge it for 2 to 3 hours. This should be done every 3 months to prevent battery damage.

Packaging and delivery

Selling UnitsSingle item
Package TypeStandard export packaging
Lead Time7-14 days after payment

Protections

Secure Payment

Your payment information is encrypted and secure. We never share your card details.

Quality Assurance

Products are verified before shipment. Contact us within 7 days if you receive defective items.

Buyer Protection

Full refund if product is not as described or doesn't arrive on time.

Supplier

🏭
Ming Feng Lighting Co.,Ltd.